Winter Haven's #1 Trusted Concrete Contractor Β |Β  Call Now: (863) 400-0803
πŸ“ž (863) 400-0803
β˜…β˜…β˜…β˜…β˜… 5.0 Google Rated Β· 15 5-star reviews
Fully Insured
Free Estimates
Locally Owned β€” Polk County
Stamped concrete backyard patio with outdoor furniture and potted palms
Serving Lake Alfred, FL

Concrete Contractors Lake Alfred, FL

New driveways, walks, patios and slabs for Lake Alfred homes, laid out to the city's driveway rules and scheduled around its next-day inspection cutoff.

Fully Insured
5-Star Rated
Polk County Local

Free Lake Alfred Concrete Estimate

Tell us about your project and we'll get back to you within 24 hours with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Response within 24 hours
  • Insured, locally owned
  • Transparent pricing β€” no hidden fees
  • Polk County concrete experience

Quick answer

Lake Alfred's land development code sets a single residential driveway at 8 to 16 ft wide where it meets the right of way, so concrete contractors in Lake Alfred start from that number. Winter Haven Concrete Co pours driveways, patios, walkways, slabs and stamped concrete in Lake Alfred and draws each layout inside the city's rules.

Lake Alfred at a glance

Lake Alfred is an incorporated city in Polk County, about 18 minutes from our Winter Haven base, and we cover it as concrete contractors in Lake Alfred. Of the single-family parcels the Property Appraiser maps inside the city, 3,107 carry a Lake Alfred mailing address and 51 a Winter Haven one, so the parcel, not the mailing city, decides who permits the work.

Ground ranges from excessively drained Candler sand to Samsula, Kaliga and Hontoon muck and poorly drained flatwoods sand. About 22% of sampled land sits in FEMA Zone AE, 13 named lakes touch the city boundary, and the city posts a wetland map. Every structure's first floor must sit 12 inches above the crown of the street it fronts.

Permit office: City of Lake Alfred, Community Development (Building Permits) Β· official site Applications go through the city's Accela system by a registered contractor or a homesteaded owner-builder. No same-day inspections; next-day requests close at 2 pm.

What concrete contractors in Lake Alfred pour: driveways, walks and slabs

Lake Alfred had 6,374 residents at the 2020 Census, and it keeps its building rules in one document, the Unified Land Development Code (ULDC). Concrete contractors in Lake Alfred should read the parts that touch your job before anything gets drawn, so we do that first. That way the layout you sign off on starts from the city's own numbers.

One rule goes back to 1977: Code Sec. 46-33 says every new home begun after September 22, 1977 needs a cement or asphalt driveway from the property line to the paved street, and when the city paves a dirt street, the owners along it get 120 days to put one in. Anyone building a driveway files a written application first.

The median single-family lot here is about 8,387 sq ft. That makes a typical Lake Alfred job a two-car concrete driveway, a front walk or a back patio, not acreage. The other towns we cover are listed on our Winter Haven service area page.

What does Lake Alfred's code say about a new driveway?

Sec. 4.2.3 of the ULDC covers vehicle access, and Figure 4.2.3.A sets widths at the right of way:

Residential driveway typeWidth at right of wayRadius
Single driveway8 to 16 ft10 ft
Shared driveway12 to 16 ft10 ft
Two-way driveway16 to 22 ft10 ft

The same section has a few more lines that can change a driveway plan:

  • Where a sidewalk runs along the right of way, Sec. 4.2.3.C.4 also caps driveway cuts at 7 ft of width per 30 linear feet of sidewalk and/or 14 ft per 50 linear feet, so on a narrow frontage we can ask Community Development which limit governs before we set the width.
  • No residential lot may have more than two driveways on the same street, and two driveways serving one lot must be at least 30 ft apart.
  • A non-alley driveway can't meet the street closer than 20 ft from where two street rights of way intersect, which matters on corner lots.
  • Parking and driveway areas can't take up more than 40% of the ground between the front building line and the front property line. A circular driveway or a wide parking pad runs into this fast.
  • If an improved alley with at least 16 ft of right of way serves the lot, vehicles take access from the alley. Lots under 40 ft wide get access only by alley, shared driveway or side street.

Want a second curb cut or a wider apron? We can measure the frontage and the front yard first, then design inside those numbers.

Our typical ranges for Lake Alfred jobs. The written estimate follows a site visit and lists tear-out, base work and finish on their own lines.

JobPer sq ftTypical projectWhat moves the price
Concrete driveway, 4 to 5 in, broom finish$8 to $14$5,000 to $10,000Tear-out adds $2 to $4 per sq ft; apron length to the street
Concrete patio, plain or broom$8 to $14$2,500 to $6,500Muck removal on low lots; access to the back yard
Sidewalk or walkway, 4 in$8 to $14$1,500 to $4,500Short runs hit a job minimum
Stamped and decorative concrete$12 to $22$3,600 to $14,300Pattern, color and sealer
Slab or shed pad, 4 in reinforced$7 to $12$2,000 to $7,500Fill needed to meet the 12 in above-crown rule
Pole barn slab, 30 x 40, 4 to 6 in reinforced$7 to $12$8,500 to $15,000Thickness, and whether it goes in before or after the frame
Resurfacing over sound concrete$3 to $7$1,500 to $3,500Decorative overlay runs $7 to $15 per sq ft
Retaining wall, per sq ft of face$25 to $45$3,750 to $6,750Height and drainage behind the wall

Ranges, not quotes. You get a free written estimate after we see the site, and it says whether the job needs a Lake Alfred permit.

Three concrete crew members in safety vests standing on a finished residential street

Who can pull a Lake Alfred permit, and what has to be on site?

The city's Building Permits page says a contractor registered in the city's Accela system has to apply for permits. Owners of homesteaded property can apply as their own contractor with an Owner Builder Affidavit, and contractors attach an Owner Application Authorization. Community Development can also help with an application at its office, and it takes fee-estimate requests before you apply.

Florida law calls for a Notice of Commencement to be recorded for improvements over $2,500 (s. 713.13 with s. 713.02(5)). Lake Alfred's page adds its own step: after recording it with the Polk County Clerk, post a certified copy, or a notarized statement that it was filed, at the job site and send one with the permit application.

Inspections here run on a tighter clock than in Winter Haven, where same-day requests are possible. Lake Alfred has no same-day inspections, and the cutoff to get on the next day's list is 2 pm. The permit card, the Notice of Commencement and the stamped documents all have to be on site. If a job needs an inspection before the pour, the 2 pm cutoff sets when the request goes in. We can plan the schedule backward from there.

One more date to plan around: Florida law has the excavator notify Sunshine 811 at least 2 full business days before digging, so the utility locate goes in before the forms do. Our Polk County permits guide compares Lake Alfred's steps with the other cities nearby.

Pouring near Lake Alfred's lakes and wetlands

Census mapping puts 13 lakes in or touching the city boundary, including Lake Alfred itself, Lake Haines, Lake Swoope, Lake Rochelle, Lake Cummings and Lake Echo. In a 71-point grid inside the city, 50 points fell on land, and FEMA's flood layer put 22.0% of those land points in Zone AE and another 8.0% in the shaded 0.2% annual chance zone. The city's floodplain page describes AE and A zones as having a 1 percent chance of flooding in any year and a 26 percent chance over a 30-year mortgage. It also posts a wetland map of Lake Alfred and offers free flood assistance and inspections.

The flood map affects the permit, too. Florida's under-$7,500 owner exemption in s. 553.79 doesn't apply on property partly or entirely in a flood hazard area, and it needs a written request with the contract either way. We can check your lot on FEMA's map before anyone plans around skipping a permit.

Candler sand, Adamsville fine sand and Samsula muck

The ground changes from block to block. In the same grid, checked against the NRCS soil survey, Candler sand led at 26.8% of the points (an excessively drained soil), Adamsville fine sand and Samsula muck took 5.6% each, and Kaliga and Hontoon muck turned up at other points. Open water took 29.6% of the grid. Muck is soft organic soil, so under a driveway or patio we can remove it and rebuild the base with compacted clean fill. On Candler sand we can compact what's there and pour.

Before and after view of a cracked old driveway replaced with new broom-finish concrete

Garage, addition or shed slab? Watch the height and spacing

ULDC Sec. 2.1.4.A.2 sets every structure's first floor at least 12 inches above the highest point of the crown of the street it fronts, unless an approved plan says otherwise. On a low lot, that number sets how much fill goes under a garage or addition slab. Detached accessory structures have to sit at least 10 ft from the house, can't go up before the house exists, and can't have their own electric or water meter. Sheds need building plans sealed by a Florida architect or engineer plus a site plan. Residential districts also get an extra 10% impervious allowance for accessory structures and related areas.

Where a pad sits matters as much as how big it is. In residential districts an accessory building can't sit forward of the house's front line, and on a corner lot it stays out of the side street setback. In the RN-1, RN-2 and UR districts the accessory setbacks are 20 ft from the street, 15 ft from a side street and 5 ft from side and rear lines.

Lake Alfred is also home to the UF/IFAS Citrus Research and Education Center and its 600-plus acres of groves. For the city's larger RR (Rural Residential) lots, the code sets a 1 acre minimum and an impervious cap of 0.40 or 25,000 sq ft, and RR accessory setbacks grow to 30 ft from the street and 20 ft from the rear line. We check these numbers before a single form is set.

Lake Alfred price examples at our current rates

Here's how we price a job as concrete contractors in Lake Alfred: each total below is one measured size times both ends of our posted per-sq-ft range. Your number comes from the free written estimate after we see the site.

JobOur rangeExample total
12 x 50 ft single driveway, broom finish (600 sq ft)$8 to $14 / sq ft$4,800 to $8,400
Same driveway, stamped$12 to $22 / sq ft$7,200 to $13,200
4 x 40 ft front walk (160 sq ft)$8 to $14 / sq ft$1,280 to $2,240
14 x 16 ft patio (224 sq ft)$8 to $14 / sq ft$1,792 to $3,136
12 x 20 ft shed pad, 4 in reinforced (240 sq ft)$7 to $12 / sq ft$1,680 to $2,880

Tearing out an old driveway adds $2 to $4 per sq ft, and a short walk can hit a job minimum. The 12 by 50 ft driveway also sits inside the city's 8 to 16 ft single-driveway width, so you can check a plan against that limit. See the concrete cost guide for the rest of our ranges, or the service pages for walkways, patios, stamped work and crack repair.

From 1892 plats to Gum Lake Preserve: what the lot tells us

About 150 recorded plats cross the city line, and they span more than a century. The oldest dated ones are the Inman Fred W Subdivision (1892), the New Armenia Revised Map (1904) and Codington (1906). The newest include Lowery Hills Phase I (2026), Silverlake Phase 2 and Gum Lake Preserve Phase 2 (both 2024), and Springs At Lake Alfred Phase 1 (2023).

That spread changes the first questions we ask on a visit. On an older lot, an old slab may have to come out first, and Sec. 46-33 has the driveway run from the property line all the way to the paved street, so we measure that apron run instead of guessing it. In a newer phase, a homeowners' association may want its own sign-off. Florida law (s. 720.3035) bars an HOA from requiring the government permit before it reviews your plans, so you can send both at once.

The Property Appraiser's largest neighborhood groups are Eden Hills, the blocks between Shinn and Lake Haines, Silver Lake, and Lake Alfred Estates with Pines and Magnolia Ridge. Live in one of them? Mention it when you call (863) 400-0803. It helps concrete contractors in Lake Alfred like us bring the right forms to the visit.

Sources

  1. Building Permits, City of Lake Alfred
  2. Unified Land Development Code (Interim SB180, effective 11/03/2025), City of Lake Alfred
  3. Sec. 46-33 Driveways; when required, City of Lake Alfred Code of Ordinances (Municode)
  4. Floodplain Information, City of Lake Alfred
  5. Florida Statutes s. 553.79, Florida Legislature
  6. Florida Statutes s. 713.13, Florida Legislature
  7. About Us, UF/IFAS Citrus Research and Education Center
  8. Web Soil Survey, USDA NRCS
Concrete crew finishing a wide residential driveway in front of Mediterranean-style Florida homes

Small-City Rules, Handled Up Front

πŸ“

Minutes From Winter Haven

Lake Alfred's center is about 3.7 miles from Winter Haven's on the Census map, so we're close by for site visits.

⭐

5-Star Rated

All 15 of our Google reviews are five stars, and you can read every one of them below.

πŸ› 

Driveways Drawn to Code

We can lay out width, radius and curb cuts against ULDC Sec. 4.2.3 before you approve a design.

πŸ’°

Prices You Can Check

Each line on the written estimate traces back to the ranges on our public cost guide.

βœ…

Insured

Insured contractor. We can send the certificate to you or your HOA before we start.

🏠

Residential & Commercial

From a front walk on a city lot to flatwork for a business, it's measured on site and priced in writing.

How We Work

The same five steps on every job, tuned to Lake Alfred's code and inspection timing.

01

Free Consultation

We measure frontage and front yard, check driveway rules, and pull flood and soil maps.

02

Site Preparation

Old concrete out, then grading. Muck gets replaced with compacted clean fill; sand gets compacted in place.

03

Forming & Reinforcement

Forms set to the approved width and radius, with fiber or rebar to match the load.

04

Concrete Pouring

4,000 PSI concrete placed and screeded, with any required inspection requested by 2 pm the day before.

05

Finishing & Curing

Finish applied, joints cut, and a 7-day cure before cars roll on it.

What Our Lake Alfred Customers Say

β˜…β˜…β˜…β˜…β˜… 5.0 / 5 Based on 15 verified Google reviews
β˜…β˜…β˜…β˜…β˜…

β€œWinter Haven Concrete Co. did an outstanding job on our driveway. From the initial consultation to the final pour, they were professional and easy to work with. The crew showed up on time, worked efficiently, and the attention to detail was clear in the final product. The new driveway looks fantasticβ€”smooth, durable, and perfectly finished.”

Tiffany GardDriveway
β˜…β˜…β˜…β˜…β˜…

β€œThey run a small but efficient crew and they did fantastic work on my driveway! My neighbor loved it so much and he hired them too, possibly the best concrete driveway contractors in Winter Haven!”

Crystal VelezDriveway
β˜…β˜…β˜…β˜…β˜…

β€œExcellent service and quality work from Winter Haven Concrete Co. We had them replace our old, damaged driveway and add a new patio. The owner made thoughtful suggestions to enhance the functionality and appearance of our new installations. The team was punctual, professional, and completed the project on time.”

Russell GowingDriveway + Patio
β˜…β˜…β˜…β˜…β˜…

β€œWinter Haven Concrete Co. did a fantastic job installing our new patio. The team was friendly, skilled, and kept everything on track. I was really impressed with their attention to detail and how professional they were throughout the process.”

Beloved A.Patio
β˜…β˜…β˜…β˜…β˜…

β€œWinter Haven Concrete Co. did a fantastic job on our driveway. The team was professional, punctual, and paid great attention to detail. The finished product looks excellent, and they made sure we were completely satisfied. Highly recommend them for any concrete work.”

JamesEdward1993Driveway
β˜…β˜…β˜…β˜…β˜…

β€œGreat concrete contractor! They had my patio done a week after calling, and the owner sure knows his stuff.”

KobePatio
β˜…β˜…β˜…β˜…β˜…

β€œThese guys were awesome and did an amazing job on my new concrete driveway. Highly recommend.”

Timmy LongDriveway
β˜…β˜…β˜…β˜…β˜…

β€œThese guys do awesome work β€” I'm so happy with my new beautiful concrete driveway.”

Abigail ScottDriveway
β˜…β˜…β˜…β˜…β˜…

β€œThis team of concrete contractors did a great job on my driveway!”

Jasmin ElizaDriveway
β˜…β˜…β˜…β˜…β˜…

β€œOutstanding group of guys! They're enthusiastic and do great work!”

Annabel NayVerified Customer
β˜…β˜…β˜…β˜…β˜…

β€œThey are a great group of guys and the owner is very kind!”

Emily BradfordVerified Customer
β˜…β˜…β˜…β˜…β˜…

β€œI recently had concrete work done by Winter Haven Concrete Co, and the entire experience was excellent from start to finish. They offered a free estimate, which made it easy to understand the scope and cost upfront β€” no surprises along the way. Their team was professional, knowledgeable, and easy to communicate with. The workmanship really stands out β€” clean lines, smooth finish, and solid construction that I know will last.”

Alex ChavezConcrete work
β˜…β˜…β˜…β˜…β˜…

β€œWe recently had our driveway done by Winter Haven Concrete Co, and the results are outstanding. From start to finish, the team was professional, reliable, and easy to work with. They showed up on time, communicated clearly, and paid close attention to every detail.”

Charity RuhDriveway
β˜…β˜…β˜…β˜…β˜…

β€œI give them 20 stars, stayed within our budget and did an excellent job. We recommend them to everyone!”

T TVerified Customer
Call (863) 400-0803

Lake Alfred Concrete Questions

How wide can concrete contractors in Lake Alfred make a new driveway?
Figure 4.2.3.A of the Lake Alfred ULDC sets a single residential driveway at 8 to 16 ft wide at the right of way with a 10 ft radius. A shared driveway is 12 to 16 ft and a two-way driveway 16 to 22 ft. Where a sidewalk runs along the street, the cut is also limited per linear foot of sidewalk, so we measure the frontage before we set the width.
Can I add a second driveway or a parking pad in Lake Alfred?
A residential lot can have up to two driveways on the same street, at least 30 ft apart. Parking and driveway areas can't cover more than 40% of the area between the front building line and the front property line, so we can measure that space first and show you how much pad fits before anything is formed.
Can concrete contractors in Lake Alfred pull the building permit for me?
Yes, if the contractor is registered in the city's Accela system. The owner of homesteaded property can instead act as their own contractor with an Owner Builder Affidavit, and contractors attach an Owner Application Authorization signed by the owner. When a permit is needed for our work, we pull it and keep the permit card on site.
How fast can I get an inspection in Lake Alfred?
Not the same day. The city's cutoff for next-day inspections is 2 pm, and the permit card, Notice of Commencement and stamped documents have to be on site. If a job needs an inspection before the pour, we request it by 2 pm the day before and set the pour after it passes.
Do I need a Notice of Commencement in Lake Alfred?
Florida law has one recorded for improvements over $2,500. Lake Alfred also wants a certified copy, or a notarized statement that it was filed, posted at the job site and included with the permit application. On contracts over $5,000, state law also has a copy filed with the building department before the first inspection.
How much of Lake Alfred sits in FEMA's Zone AE?
In a grid sample inside city limits, 22.0% of the points on land were Zone AE, and another 8.0% fell in the shaded 0.2% annual chance zone. Your parcel is what counts, so check it on FEMA's map. If your lot is in a flood hazard area, the s. 553.79 under-$7,500 permit exemption doesn't apply, and the city offers free flood assistance.
Does a new Lake Alfred house have to come with a paved driveway?
Yes. Code Sec. 46-33 says new construction begun after September 22, 1977 must include a cement or asphalt driveway from the property line to the paved street. When a dirt street gets paved later, the owners along it have 120 days to build one, and either way the city wants a written application first.

Recent Polk County Projects

Three concrete crew members in safety vests standing on a finished residential street
Before and after view of a cracked old driveway replaced with new broom-finish concrete
Concrete crew finishing a wide residential driveway in front of Mediterranean-style Florida homes

Hire Concrete Contractors in Lake Alfred

Send your address and tell us what you want poured. We'll check the code and measure, then give you a free written price. Call (863) 400-0803.

πŸ“ž Call (863) 400-0803 Request Quote Online
πŸ“ž Call Now Get Quote
Free Quote